Pavilion or Field Booking Form
The upgrade and Grand Opening of the newly refurbished Cricket Pavilion - July 2006
In 2003 the old Pavilion building was in poor condition and funding was secured from a European Grant to refurbish it.
The work commenced during 2004 and it was completely upgraded, both inside and out. A new kitchen was installed, electrics were upgraded, the roof was replaced and modified and the outside walls were clad over the original brickwork.
In July 2006 there was an official opening ceremony.
The pictures opposite show the transformation.








